Need to drop a helicopter into a pool? No problem!
Hydrautech has provided a wide range of Aquatic Engineering design, consulting, reporting and related services for Australian Defence Forces.
ADF Puckapunyal
Hydrautech provided the Aquatic Engineering design for a new 50m Pool included as a part of a new sports complex development at "Pucka". This project is currently under construction with completion expected in 2023.
Simpson Barracks
Hydrautech was engaged to provide an Existing Conditions Audit Report including recommendations to improve the ageing pool facilities at Simpson Barracks in Watsonia.
RAAF Amberley
Hydrautech provided the Aquatic Engineering design for the D&C contractor. The new pool features training apparatus elevated over the pool.
HMAS Albatross
Hydrautech provided the Aquatic Engineering design for the D&C contractor. A new pool for the Defence Force in Nowra.