Hydrautech Designs
  • Home
  • About
  • Services
  • Projects
  • Our Edge
  • Our Clients
  • Contact

PROJECTS

AQUATIC CENTRES

Picture

Melbourne Sports and Aquatic Centre - MSAC The Original!

Hydrautech provided the Aquatic Engineering design of this iconic World-Class facility for the D&C contractor. Hydrautech have been engaged several times over the life of MSAC to design improvements including backwash water recovery and rainwater harvesting.
Picture

Picture

Oran Park Leisure Centre

Aquatic Centre featuring a 50m Lap Pool with Moveable Boom, Spa Pool and Leisure Pool with Toddlers Pool and Rapid Track "Horizontal Slide" Water Feature inspired by the Oran Park Raceway. The design for this project was recently completed with construction expected to commence later in 2022.
Picture

Picture
Bundaberg Aquatic Centre
​​A landmark Aquatic Centre for the City of Bundaberg featuring a 50m Lap Pool with Moveable Boom, 25m Lap Pool and Program Pool with Hydro-Zone. Advanced hybrid dual heat pump / gas heater design. The design for this project was recently completed with construction expected to commence later in 2022.
Picture

Picture

St Albans Leisure Centre

A large Aquatic Centre featuring 50m Lap Pool with SwimWall, Learn-to-Swim Pool, Program Pool, Spa Pool, Leisure Pool with Splash Pad, Water Features and Water Slides. 
Picture

Picture

Kew Recreation Centre

A challenging engineering design for  new pools constructed on an elevated structure  across a restricted site over a carpark below. 25m Lap Pool, Learn-to-Swim Pool, Program Pool, Spa Pool and Leisure Pool with Splash Pad and Water Features. This project is currently under construction with completion expected in 2023.
Picture

Picture

YAWA Rosebud Aquatic Centre

A large Aquatic Centre featuring 50m Competition Pool with Moveable Boom, Learn-to-Swim Pool, Program Pool,  Spa Pool, Toddlers Pool and Leisure Pool with Splash Pad and Water Features. A long awaited premier aquatic facility for the Rosebud community.
Picture

Picture

Maribyrnong Aquatic Leisure Works

A Leisure redevelopment at an existing Aquatic Centre including a large Splash Pad with Water Features and Water Slides. A new standalone treatment plant provided for the new leisure facilities.
Picture

Picture

Casuarina Aquatic Darwin

A significant outdoor Aquatic development featuring a 50m Lap Pool and a large combined Leisure and Learn-to-Swim Pool. With the design completed, there are great expectations for the construction of this landmark project.
Picture

Picture

​Club Jubilee

Best value-for-money design delivered for private developer client. 25m Lap Pool, combined Leisure and Learn-to-Swim Pool, Toddlers Pool, Splash Pad, Water Features and Water Slides. High efficiency commercial electrochlorination provided for this outstanding project.
Picture

Picture

Gurri Wanyarra Wellbeing Centre Bendigo

A large Aquatic Centre constructed on a challenging site complete with an old creek bed and gold mines! 50m Lap Pool with Moveable Boom, Program Pool, Spa Pool, combined Leisure and Learn-to-Swim Pool and Toddlers Pool.
Picture

Picture

Eltham Leisure Centre

An environmentally sensitive redevelopment with specific planning requirements. A new benchmark in environmentally sensitive Aquatic Design. 25m Lap Pool, Program Pool, Spa Pool, combined Leisure and Learn-to-Swim Pool, Toddlers Pool and Splash Pad.
Picture

Picture

Splash Aqua Park Craigieburn

A large Aquatic Centre for a new growth area in the ever expanding suburbs of Melbourne. 50m Lap Pool with Moveable Boom, Program Pool, Spa Pool, combined Leisure and Learn-to-Swim Pool, Toddlers Pool, Splash Pad, Water Features and Water Slides.
Picture

Picture

Aquanation Ringwood Aquatic Centre

A World-Class facility and one of Victoria's leading Aquatic Centres with 10m diving tower, 75m Competition Pool (split with two Moveable Booms). This competition focussed venue also offers extensive Leisure, Learn-to-Swim, Hydrotherapy, Water Features and Water Slides.
Picture

Picture

Aquarena Doncaster

A complex project completed over 6 individual stages. Multiple redundancies, change-overs and pre-purchase of water treatment equipment managed for the client. 50m Lap Pool, 25m Lap Pool, Program Pool, Spa Pool, Learn-to-Swim Pool, Toddlers Pool, Splash Pad , Water Features and Water Slides.
Picture

Picture

Shenzhen Aquatic Centre China

A first for China, Hydrautech provided the design and supervised the installation of a Dive Impactor for the Diving Pool at one of China's premier sporting facilities.
Picture

Picture

Broadmeadows Leisure Centre

A new 50m Pool with Moveable Boom provided as a part of the redevelopment of this site. A new insert grid type pool floor designed for the existing 25m Lap Pool to provide Learn-to-Swim functionality.
Picture

Picture

Taurama Sports Centre Papua New Guinea

Hydrautech specified modular pool structures and designed pool water treatment systems that could be successfully constructed in Papua New Guinea. Pools provided with both heating and cooling systems to suit seasonally variable temperatures. Rainfall diversion system provided for outdoor pools.
Picture

Picture

Gungahlin Leisure Centre Canberra

The Aquatic Engineering design provided by Hydrautech for this project was tailored to achieve a given client budget. 50m Lap Pool with Moveable Boom, combined Leisure and Learn-to-Swim Pool, Toddlers Pool, Splash Pad with Water Features.
Picture

Picture

Gippsland Regional Aquatic Centre

Hydrautech provided the concept design and project brief for a D&C contract that delivered this significant Aquatic Centre in Traralgon Victoria.
Modular pools were provided for this project.
Picture

Picture

Doone Kennedy Hobart Aquatic Centre

A new Program Pool for Tasmania's premier aquatic facility in Hobart. Hydrautech has designed a number of upgrades at the centre since 1999.
Picture

Picture

Keilor East Leisure Centre 

Hydrautech provided the concept design and project brief for a D&C contract that delivered this significant Aquatic Centre in Keilor East. 
​Modular pools were provided for this project.
Picture

Picture

URBNSURF

Hydrautech provided design advice for the overall facility and the design for the Plunge Pools / Hot Tubs at this landmark surfing focused  facility in the Melbourne suburb of Tullamarine.
Picture

Picture

Casey ARC

A Wave Pool for the fastest growing region in Melbourne (at the time of design).
​Hydrautech provided the Aquatic Engineering design for the D&C contractor. 50m Lap Pool, Wave Pool, Program Pool, Spa Pool and Toddlers Pool.
Picture

Picture

Stromlo Leisure Centre Canberra

Hydrautech provided the concept design and project brief for a D&C contract that delivered this significant Aquatic Centre in Canberra. 
Picture

Picture

Geelong Leisurelink

Hydrautech provided the Aquatic Engineering design for the D&C contractor engaged to deliver this landmark project for Geelong. 50m Lap Pool with Moveable Boom, Leisure Pool, Learn-to-Swim Pool, Program Pool, Toddlers Pool,  Spa Pool, Splash Pad, Water Features and Water Slides.
Picture

Picture

Hamilton Indoor Leisure  and Aquatic Centre

Hydrautech provided the Aquatic Engineering design for the D&C contractor engaged for the project. 25m Lap Pool and combined Leisure / Program Pool.
Picture

Picture

Ballarat Aquatic Centre

Hydrautech provided the Aquatic Engineering design for the new 50m Lap Pool added to the existing main Aquatic Centre in Ballarat.
​Roll-out base slab reinforcement was implemented for this fast-tracked project.
Picture

Picture

Bayfit Aquatic Centre Altona

Hydrautech provided the Aquatic Engineering design for the complete redevelopment of the existing Aquatic Centre including a 25m Lap Pool, Leisure Pool and Toddlers Pool.
​An existing pool shell was converted to a rainwater tank with stored water treated and used for pool water supply.
Picture

HOTELS, RESORTS and APARTMENTS

Picture

Sheraton Resort Port Douglas 

After 35+ years of successful operation as one of Australia's premier resort destinations, Hydrautech was engaged to design the replacement pool filtration plant for this iconic project featuring Australia's largest resort pools at over 20 million litres of water.
Picture

Picture

Emirates 6 Star Resort

Hydrautech provided the complete Aquatic Engineering design for this high  end luxury resort - Australia's first 6-Star experience.
Each of the forty villas has its own private pool.
​The main resort features a magnificent elevated edge Infinity Pool.
Picture

Picture

Ritz-Carlton Melbourne

Melbourne's own Ritz-Carlton Hotel at the west end of Melbourne's CBD. Delivered as a part of the West Side Place development, Hydrautech designed the pool water treatment plants featuring ceramic membrane filtration technology in response to the project brief for the "best pool water quality in the world".
Picture

Picture

Upper West Side

The largest residential development in Australia (at the time of design). Featuring over 2,500 apartments, Hydrautech provided the pool water treatment design for all of the pools provided for this extensive development.
Picture

Picture

GTV9

The former home of TV Channel 9, Hydrautech provided the Aquatic Engineering design for the pool included as a part of this ​prestigious project.
Picture

Picture

RACV Cape Schanck

One of several RACV resorts designed by Hydrautech, the World Class resort at Cape Schanck Victoria provides a great example of the high level of treatment and finishes that can be provided for high end Wellness facilities.
Picture

Picture

RACV Royal Pines

Hydrautech provided the water treatment design for this premier RACV facility in Queensland.
Picture

Picture

RACV Cobram

Hydrautech provided the design and reporting necessary for the rectification of pool tiling at this regional RACV facility.
Picture

Picture

RACV Torquay

One of several RACV resorts designed by Hydrautech, the World Class resort at Torquay Victoria provides a great example of the high level of treatment and finishes that can be provided for high end Wellness facilities.
Picture

Picture

Melbourne Quarter R1

Hydrautech provided detailed advice, design and reporting for the construction of this challenging suspended pool and spa.
Picture

Picture

Elizabeth Quay Perth

Stunning pools provided for this landmark project in Perth. Hydrautech provided the Aquatic Engineering design for the D&C contractor engaged for the project.
Picture

Picture

Crown Pools

Hydrautech has provided design services, engineering advice and a number of reports for the pools featured across the Crown Towers precinct in Melbourne.
Picture

Picture

Eastbourne Penthouse

A top-end penthouse pool for this premier development in Melbourne. ​Hydrautech provided the Aquatic Engineering for this impressive Infinity Pool.
Picture

Picture

Marriot Hotel Perth

A beautiful pool provided for this landmark project in Perth. Hydrautech provided the Aquatic Engineering design for the D&C contractor engaged for the project.
Picture

Picture

Platinum Apartments

An award-winning project, Hydrautech provided the Aquatic Engineering for this impressive project in the heart of Melbourne's Southbank precinct.
Picture

Picture

35 Spring Street

Overlooking the Treasury and Fitzroy Gardens, this project features a stylish pool designed by Hydrautech.
Picture

Picture

Sebel Yarrawonga

Overlooking Lake Mulwala on the Victoria / New South Wales border, Hydrautech provided the Aquatic Engineering design for the D&C contractor engaged for this regional project.
Picture

Picture

Capitol Grand

Hydrautech provided the Aquatic Engineering design for this impressive project in Melbourne's South Yarra.
Picture

Picture

Caulfield Village 1 and 2

This two-stage project features multiple pools with Aquatic Engineering designed by Hydrautech.
Picture

Picture

Carrington Estate
​New Zealand

Hydrautech provided the Aquatic Engineering concept design and design brief for this impressive project in New Zealand.
Picture

Picture

Bolte Precinct

A new pool facility provided as a part of the Bolte Precinct development at Melbourne's Docklands.
​Overlooking the Yarra River, Hydrautech provided the Aquatic Engineering for this significant project. 
Picture

Picture

Tudor Village

Hydrautech provided the Aquatic Engineering for this premier retirement village.
Picture

Picture

V5 Convesso Concavo

One of the first major developments in Melbourne's Docklands, Hydrautech provided the Aquatic Engineering for this significant two-stage development.
Picture

SPLASH PARKS and WATER FEATURES

Picture

Wetside Splash Park 

Hydrautech was engaged to design the replacement of an existing Wave Rider (left) with a new interactive Splash Pad  (right) featuring "ninja warrior" style obstacles with tipping buckets and perimeter cannons to challenge the most capable ninja!
Picture

Picture

Eildon Splash Park

A new Splash Pad for Eildon. This project is currently in the design phase.
Picture

Picture

Mildura Riverfront Waterplay

An expansive water play precinct stretching along the Murray River in Mildura. Many project specific design considerations for this unsupervised public space. Hydrautech provided the pool water treatment and water feature design for this impressive regional project.
Picture

Picture

NGV Water Wall

Designed by Hydrautech in conjunction with the CSIRO and installing D&C contractor, the NGV water wall was completely rebuilt with a new treatment plant as a part of a major redevelopment of this famous Melbourne landmark.
Picture

Picture

South East Water Reflection Pool

Seems appropriate - a water feature for a water authority. Ionisation treatment was implemented for this project to provide an odour free water space adjacent to workplace offices.
Picture

Picture

Melbourne Zoo Water Maze

A quirky educational exhibit for Melbourne Zoo.
Water features designed by Hydrautech to demonstrate the importance of water recycling for our environment.
Picture

Picture

Franklin Square Hobart

Hydrautech was engaged by Hobart City Council to design a sensitive redevelopment of their landmark water fountain in Franklin Square Hobart. 
Picture

Picture

Melbourne Museum

Designed by Hydrautech in conjunction with the installing D&C contractor, water features (one with eels!) were created as a part of the Melbourne Museum development in Melbourne's famous Carlton Gardens, adjacent to the Melbourne Exhibition Buildings.
Picture

HYDROTHERAPY and WELLNESS

Picture

Hydrotherapy Pools

From Hydrotherapy Pools integrated into larger aquatic facilities to specialist Hydrotherapy Pools for special needs projects and hospitals, Hydrautech has designed many specialist pools including compliance with AS3979 - Hydrotherapy Pools, where appropriate.
Picture

Picture

Wellness and Spa Facilities

Hydrautech has provided the Aquatic Engineering design for World Class Wellness and Spa facilities; from Ritz Carlton Hotels to RACV resorts to the famous Hepburn Springs Bathhouse.
Picture

Picture

St. John of God Richmond

Commencing construction in 2022, Hydrautech provided the Aquatic Engineering design for a new Wellness Pool as a part of a redevelopment of the existing Hospital in Richmond New South Wales.
Picture

Picture

Glenallen School

Currently under construction in 2022, Hydrautech were pleased to provide the Aquatic Engineering design for a new Hydrotherapy Pool provided for the kids at the Glenallen School.
Picture

Picture

Ritz-Carlton Melbourne

Hydrautech provided the pool water treatment design for the Wellness Pools available for guests at the Ritz-Carlton Melbourne.The pool water treatment features ceramic membrane filtration technology in response to the project brief for the "best pool water quality in the world".
Picture

Picture

Beleura Private Hospital

Hydrautech provided the Aquatic Engineering design for the Hydrotherapy Pool provided as a part of the redevelopment of this project in Mornington.
Picture

Picture

Hepburn Springs

One of Victoria's premier attractions, the Hepburn Springs Bathhouse features pool water treatment plants designed by Hydrautech in conjunction with the D&C contractor. These impressive pools feature both fresh and mineral water experiences.
Picture

Picture

Austin Health

Hydrautech has provided ongoing audits and compliance reports for the existing Hydrotherapy Pools provided at Austin Health facilities.
Picture

Picture

Southern Cross Club Canberra

Hydrautech provided the Aquatic Engineering design for the Hydrotherapy Pool provided as a part of this project in Canberra.
Picture

EDUCATION

Picture

Learn to Swim Schools

Hydrautech has provided the Aquatic Engineering design for numerous Learn to Swim facilities, from Learn to Swim Pools integrated into larger aquatic facilities, to Learn to Swim Pools included in dedicated private developments. 
Picture

Picture

Ivanhoe Grammar

The highest standard for a Private Grammar School.
​As a part of a significant Sports and Aquatic Centre development, the 50m Pool features a Moveable Boom, Movable Floor and Tilt-Up Wall.
A magnificent pool in a beautifully finished pool hall.
Picture

Picture

Caulfield Grammar

A new 50m Pool with Diving Bowl  featuring 1m and 3m springboards.
​This  pool also includes a Moveable Boom, Moveable Floor and Tilt-Up Wall.
Picture

Picture

Camberwell Grammar

A new 50m Pool with Moveable Boom provided as a part of a significant Sports and Aquatic  Centre development.
​A separate Learn to Swim Pool is also provided at this facility.
Picture

Picture

Mentone Girls Grammar

A new 25m Pool with Diving Bowl  featuring 1m and 3m springboards.
​A separate Learn to Swim Pool is also provided at this facility.
Picture

Picture

St Catherines School

Hydrautech provided the Aquatic Engineering design for the D&C contractor.
​25m Lap Pool with Diving Bowl.
Picture

Picture

Wynnum State School

Hydrautech provided the Aquatic Engineering for the 25m Lap Pool provided for the Wynnum State School in Brisbane.
Picture

MILITARY and DEFENCE

Picture

Need to drop a helicopter into a pool? No problem!

Hydrautech has provided a wide range of Aquatic Engineering design, consulting, reporting and related services for Australian Defence Forces.
Picture

Picture

ADF Puckapunyal

Hydrautech provided the Aquatic Engineering design for a new 50m Pool included as a part of a new sports complex development at "Pucka". This project is currently under construction with completion expected in 2023.
Picture

Picture

Simpson Barracks

Hydrautech was engaged to provide an Existing Conditions Audit Report including recommendations to improve the ageing pool facilities at Simpson Barracks in Watsonia.
Picture

Picture

RAAF Amberley

Hydrautech provided the Aquatic Engineering design for the D&C contractor.
​The new pool features training apparatus elevated over the pool.
Picture

Picture

HMAS Albatross

Hydrautech provided the Aquatic Engineering design for the D&C contractor.
​A new pool for the Defence Force in Nowra.
Picture

SPORTS TRAINING

Picture

Hawthorn Football Club Kennedy Centre

Home of the Mighty Hawks, Hydrautech provided the Aquatic Engineering design for the pools being provided as a part of the new Kennedy Community Centre.
​Go the Mighty Hawks!
Picture

Picture

Western Bulldogs Football Club

Hydrautech provided the Aquatic Engineering design for the pools being provided as a part of the redevelopment of the Whitten Oval.
Picture

Picture

Carlton Football Club

Hydrautech provided the Aquatic Engineering design for the pools being provided as a part of the redevelopment of Ikon Park.
Modular pools were provided for this project.
Picture

Picture

Richmond Football Club

Hydrautech provided the Aquatic Engineering design for the D&C contractor for the pool provided as a part of the redevelopment of the Punt Road Oval.
Picture

Picture

MSAC Recovery Pools

Hydrautech provided the design for two new Recovery Pools proposed as a part of ongoing upgrades at MSAC.
Picture

ANIMALS, ZOOS and EXHIBITS

Picture

Sea Life Melbourne Aquarium Upgrade Works

It's not easy to move a large shark - another project for Hydrautech. As a part of refurbishment work that required draining the main aquarium, Hydrautech provided the design to allow the existing Life Support Systems to remain operational during this sensitive project.
Picture

Picture

Horse Training Pools

Hydrautech has provided the Aquatic Engineering for Horse Pools at Hobart, Geelong, Caulfield and Flemington for the D&C contractor.
​
Picture

Picture

Taronga Zoo Precincts

Hydrautech has provided unique designs from Platypus Pools to natural water courses for several precincts  at Taronga Zoo.
​Precincts include the Australian Coastline, Asian Elephant, Backyard to Bush and the  Wildlife Retreat project.
Picture

Picture

Melbourne Zoo Precincts

A specific Elephant friendly pool was provided as a part of a new large exhibit for the Elephants at Melbourne Zoo.
​Hydrautech provided the Aquatic Engineering for the D&C contractor. Hydrautech has also designed a number of Water Features at the Zoo.
Picture

Picture

Healesville Sanctuary

What are the ideal water conditions and temperatures for a Platypus?
​Hydrautech provided the water treatment design for the new Platypus exhibit at Healesville Sanctuary that can maintain pool water temperatures at ideal conditions (heating and cooling).
Picture

ESD, UPGRADES and SPECIALIST PROJECTS

Picture

Regional Pool Rescue Work

Designs provided by Hydrautech have "rescued" many regional pools.
​In just one municipality in Victoria, Hydrautech designed pool upgrades that saved community pools in Birchip, Sea Lake, Wycheproof, Charlton and Beaufort.
Picture

Picture

Rainwater Harvesting and Backwash Heat Recovery

Hydrautech has designed Rainwater Harvesting and Backwash Heat Recovery Systems for 50+ aquatic projects across Australia.
​These systems greatly improve both water and energy efficiency.
Picture

Picture

Audits and Reports

Hydrautech has conducted Audits and Reports for 50+ aquatic projects across Australia.
​In just one municipality  in Victoria, Hydrautech provided pool upgrade reports for Yea, Alexandra, Eildon and Marysville.
Picture

Picture

Upgrades including Electrical

From replacing a wave machine in Mildura to moving a pool plantroom to make way for a new gym in Swan Hill, Hydrautech has assisted many aquatic facilities to maintain their assets, develop their sites and improve efficiency.
Picture

Picture

Heat Recovery and Geothermal

Hydrautech was engaged to design a replacement pool water treatment plant for the Portland Leisure and Aquatic Centre in Western Victoria. ​This commission involved the redesign and recommissioning of an existing  geothermal water supply used for heating of the entire facility.
Picture

Picture

High Functioning Pools

Hydrautech has designed some of the most advanced features in swimming pools including Moveable Booms, Moveable Floors, Reduced Depth Fixed Floors, SwimWalls, Tilt-Up Walls, Timing Systems, Underwater Lighting, Scoreboards and Photography.
Picture

Picture

A World First! Doone Kennedy Hobart Aquatic Centre

Hydrautech provided the design for the heating upgrade works at this unique project. Heating is provided by two independent systems; water-to-water heat pumps and gas-fired boilers. The source water for the heat pumps is treated effluent from the nearby sewage treatment plant - yes seriously and it works brilliantly!
Picture
Hydrautech Designs Pty Ltd
​Copyright
  • Home
  • About
  • Services
  • Projects
  • Our Edge
  • Our Clients
  • Contact